CCC Application
From application to certificate
A CCC application runs through a designated certification body: the technical file and samples go in, type testing is carried out in a designated laboratory, the factory is inspected, and the certificate is issued for a named factory and product.
We prepare and drive the whole file, including the parts that most often hold projects up — the critical component list and the factory quality documentation.
What this covers
- Selection of the certification body and designated test laboratory
- Technical file: specification, schematics, PCB layout, critical component list
- Type testing against the applicable GB standards
- Factory inspection arrangement and preparation
- Certificate issue, CCC mark application and later change filings
More on CCC Certificate
Have questions about CCC Application? Our experts respond within 24 hours.