SRRC sample
Preparing samples that pass first time
Most delays in an SRRC project are sample problems, not test failures: a unit that cannot be held in continuous transmit, no way to lock a channel, or missing accessories and power supplies.
We agree the sample list and the test-mode requirements with the laboratory before shipping, so the units arrive ready to test.
What this covers
- Sample quantity and configuration agreed with the laboratory up front
- Test firmware or test-mode commands: continuous transmit, channel and power lock
- Antennas, cables, power supplies and any required accessories included
- Conducted-test provisions — a temporary RF connector where the antenna is integrated
- Shipping and customs documentation for test samples into China